Ficool

Chapter 840 - Chapter 276: Operation Begins—Repairing White Water Dam!

The situation was the same as the survey two months ago: the damage to White Water Dam had not worsened and it was still stable.

Cheng Ye paced back and forth to observe a full circle, and quickly settled the overall construction plan in his mind.

First, the flow had to be cut off and diverted to ensure the dam body remained dry during construction. In the Wasteland this was no problem at all—just pick any direction in the vast Wilderness to divert the river, and it didn't matter even if it flowed into an abandoned village nearby.

After diversion, the carbonized surface of the dam body would be cleaned, C30 concrete would be mixed at the proper ratio and poured in layers, and after a week of curing it could be put into operation.

This is the end of Part One, download Chereads app to continue:
More Chapters