John initiated the inspection, and his prosthetic eye began to flicker, with a torrent of data constantly appearing before his eyes.
This feeling was somewhat similar to looking at the Black Spider blueprints.
John finished analyzing the inquiry protocol content, but found that none of his current devices could support it—the scan results showed insufficient processing capacity.
He shifted his attention to the box at his feet.
Inside it was a familiar hound trenching machine, the raw material for transforming it into a Black Spider.
As a versatile machine by Jingke Heavy Industry, while it possessed strong digging, collecting, and carrying capabilities, its load capacity did not meet the standards of Transport Protocol 308, and its mobility was barely adequate.
To transform it into a Black Spider, other components were needed.