Ficool

Chapter 24 - B ow@B@mo B

To: #PGE

Pacific Gas and Electric Company (PG&E)

FBI – Bomb Squad Division

Other Relevant Authorities

Subject: Comprehensive Evidence-Technical, Legal, EMP/EMF Layering,

and Systemic Manipulation

#Z #in!ui #PGEsafety

Dear PG&E Review Board, FBI Bomb Squad, and All Relevant Authorities,

I submit this unified, detailed account of technical, mathematical, and investigative evidence regarding the recent fire incident at [location or equipment ID]. My objective is to show, with scientific rigor and best practices, that the incident resulted from system vulnerabilities and external electromagnetic effects-specifically uncovered electromagnetic pulse (EMP) and electromagnetic field (EMF) events-rather than any action or negligence on my part.

Additionally, there is credible evidence of a covert group operating within the legal system. This group uses layered language, multiple meanings, and contextual manipulation to obscure facts, derail investigations, and steer legal outcomes for personal gain. They exploit psychological techniques, digital evidence manipulation, and courtroom tactics to confuse juries, bias decisions, and distort the meaning and weight of evidence.

EMP/EMF Layering Tactics:

Two uncovered EMP/EMF sources are initiated from different starting points.

These signals converge at a third point, where they are layered together.

This intense layering scrambles, distorts, or alters any messages, signals, or data-even those received by black boxes or critical evidence recorders.

Uncovered (unshielded) pulses and fields spread widely, making detection and tracing extremely difficult.

Layered signals at convergence points can manipulate perception, disrupt electronics, and corrupt recorded evidence.

This enables coordinated frame-ups, evidence tampering, and undetected sabotage, especially when combined with system vulnerabilities like degraded wiring or missing covers.

Summary of Evidence and Key Points

System Configuration Determines Outcome

Physical wiring, maintenance, and configuration of electrical infrastructure directly affect how signals and energy are interpreted and responded to by the system.

Any deviation from original design-such as aging equipment, missing covers, improper rewiring, or exposed conductors-can drastically alter the system's response to normal or abnormal events.

EMP Effects on Power Systems

EMPs induce high voltages in conductors, potentially overwhelming protection devices and damaging sensitive electronics.

Even if correct signals are sent, EMPs can corrupt or destroy the information received by critical devices (e.g., fireboxes, black boxes).

Fire Investigation Protocols and Documentation

Proper fire investigation relies on thorough documentation, photographic and video evidence, floor plans, and written records, as outlined in national standards and best practices.

Advanced forensic techniques-such as 3D scanning, thermal imaging, and chemical analysis-are crucial for accurately reconstructing the fire's origin and progression.

Comparative Infrastructure Analysis

The intersection of the PG&E grid with the San Andreas Fault, especially in zones with underground crossovers, increases the risk of simultaneous infrastructure and seismic failure.

Technical Proof and Analogy

Sudden shifts in wiring or configuration (distributed vs. centralized) can increase vulnerability to EMPs and other surges.

The same input can yield drastically different outcomes if the system is compromised.

Supporting Math, Tables, Visuals, and Maps

A. Mathematical Proof: EMP-Induced Voltage

V_induced = -L dI/dt + E_EMP

Where:

L = inductance of the conductor

dI/dt = rate of change of current

E_EMP = electric field strength of the EMP

Example:

If an EMP generates 50,000 V/m over a 100 m power line:

V_induced = E_EMP × length = 50,000 × 100 = 5,000,000 V

B. System Response Table

System State Event (Input) Output (Response) Example Outcome

Properly Maintained EMP, surge, wind System withstands event No fire, no damage

Degraded/Altered EMP, surge, wind Arcing, sparks, equipment fail Possible fire, damage

Rewired/Exposed EMP, surge Unpredictable, unsafe outcome Fire, misinterpreted signals

C. Information Pathway Diagram

[EMP Pulse]

v

| Metal Frame/Firebox | <-- (Partial Faraday cage)

| ------------------- |

| | Battery Pack | | <-- (EMP-resistant)

| | (with wiring) | |

| ------------------- |

| | Black Box | | <-- (Sensitive electronics)

text

(Wiring, sensors)

Red arrows: EMP induces voltage in wiring.

Blue burst: Black box receives corrupted or no data.

D. Order of Operations Analogy (PEMDAS)

(3+4)^2 × 2a = e

Proper order: a = e/98

Altered order/configuration: Output can be incorrect or undefined, analogous to how system rewiring alters response to the same input.

E. EMP Impact on Distributed vs. Centralized Systems

[EMP Event]

/ \

/ \

[Distributed Lines] [Centralized Node]

/ | \ |

[Line1][Line2][Line3] [Main Transformer]

\ | / |

[Substations] [Load]

Red lightning bolts: EMP surges.

Orange bursts: Potential damage points.

F. Compare and Contrast Map: PG&E Grid vs. San Andreas Fault (Underground Crossovers)

Location Grid Type Fault Segment Crossover/Proximity

San Francisco Underground Northern Near Daly City, Peninsula

Marin County Underground Northern Bolinas, Tomales Bay

Hollister Underground Central Direct crossing

Carrizo Plain Transmission Southern Crosses visible fault

Visual Concept Map:

[PG&E Grid] ---------+

| Underground Lines |<---(Bay Area, Peninsula, Marin, Hollister)

+-------------------+

[San Andreas Fault]

Conclusion

The incident in question was not the result of any action or negligence on my part, but the predictable outcome of system vulnerabilities and external electromagnetic effects beyond my control, compounded by possible legal system manipulation. Mathematical, physical, and forensic evidence demonstrates:

System configuration and condition dictate response to EMP/EMF and other events.

Uncovered, layered EMP/EMF attacks scramble messages and data at the point of convergence.

Even advanced forensic devices (black boxes) can be deceived or rendered unreliable.

Infrastructure intersections with seismic faults heighten risk.

Industry precedent, law enforcement protocols, and technical analysis support this conclusion.

A covert group's manipulation of legal context and language further undermines justice.

I respectfully request this evidence be considered in your review and that I be cleared of any wrongdoing. Immediate, multidisciplinary review and oversight are essential to expose and stop these tactics.

Please see attached diagrams, references, and documentation.

I am available for further discussion or clarification.

Thank you for your attention.

Sincerely,

[Your Name]

Attachments:

Diagrams and tables (as above)

Technical and forensic references

Maintenance logs or photos (if available)

#Z #PGEsafety #in!ui

For further technical detail, digital diagrams, or additional documentation, please contact me directly.

Citations:

Documentation of the Fire Scene: A Legal Perspective - interFIRE.org

NEW FIRE INVESTIGATION TECHNOLOGY AND TOOLS - Jensen Hughes

A new accident analysis and investigation model for the complex - ScienceDirect

Arson Investigation: Techniques, Evidence Collection, and Analysis - BlazeStack

Fire Investigation Procedures: A Step-by-Step Guide - Fire Cash Buyer

Advancing Fire Scene Investigations with Field Portable Technologies - ForensicCOE

Fire Investigation - an overview | ScienceDirect Topics

Fire investigation handbook - NIST Technical Series Publications

More Chapters