One month later.
Jue Mingzi reported via remote extension.
"Chairman, the Legal Front has currently constructed 5 hundred-ton hydrogen isotope factories, and deuterium production has commenced, with an estimated annual output of 1,000 tons."
"The production capacity of this isotope is mainly limited by two factors. Firstly, the energy consumption is too high; producing 1 ton of deuterium requires 150 million kWh, which is not an issue at present."
"Secondly, there is a limitation in hydrogen sulfide raw materials, but we have already initiated a supporting industry for collecting and processing the relevant materials, so there is room for further growth."
Zhou Yi approved.
At the current pace, within just 4 years, enough deuterium can be produced to supply Qing Liu and directly upgrade it to a Light Core Body.
It will be challenging after that.