Watching intently.
"C10 malfunctioned, work has stopped."
A warning sounded in my ear.
I didn't pay it any mind.
It's equipment, there will be errors. Although the materials are genuine, the on-site conditions are unpredictable. It's just a small issue. Problems occur, solutions follow; modular design makes repairs convenient.
"C10 has been transported to the repair area, replacement equipment for C10 is in position and starting up..."
Only ten seconds later.
The new equipment was transported over.
Continue.
An hour later, the result was out. At this extraction speed, one ton of gold can be obtained in a day, considering the low surface concentration. The production can soon increase.
In less than half a month, it could double.
If things go smoothly.
Soon.
This place will become his highest monthly production gold mine, even higher than Algeria's. As for the specific reserves, the conclusion came two days ago, between seven thousand and nine thousand tons.