The construction workers came well-prepared, measuring while setting up camp.
Once the data was ready, it only required one person to take it back, then production materials could be shipped over and construction could begin immediately.
There's no need for personnel to shuttle back and forth.
Quickly, the data was prepared, Ling Feng went to deliver it, and then it was just a matter of waiting for the transport ship to arrive.
In the following two days, Ling Feng, Ling Yao, and Li Chunxi went to Shiliu Village.
During these two days, Li Chunxi didn't stay on the Lingyun ship watching movies but followed Ling Yao everywhere she went.
Ling Yao knew she wanted to become closer and didn't refuse, instead, she changed her usually gentle demeanor and chatted with her a lot.
Meanwhile, Ling Feng was running back and forth between the county and the village, because the power project was nearing completion, and more crucial matters were about to unfold.
