Ficool

Chapter 328 - Chapter 226 Successful Production (First Update)

The so-called trial run refers to a period of test operation before the official run, aimed at identifying and addressing potential issues.

This is a common occurrence in production, as there are always discrepancies between theoretical design and actual operation; no one knows what problems might arise.

After Chen Xin announced the completion of adjustments to the production line, the isotope thermoelectric battery production line naturally needed to undergo a trial run.

There's not much to say about the trial run itself; workers start up the equipment and operate according to actual procedures. As long as there are no issues and the equipment runs smoothly, the trial run naturally transitions into official operation.

The carefully selected and trained workers followed regulations to put on protective suits for cleaning and disinfection, and then entered the factory to their respective positions.

This is the end of Part One, download Chereads app to continue:
More Chapters